APPLICATION GUIDELINES
What Requires Commission Review
Documentation Required for Review by Historic District Commission
New Construction/Additions (including garages)
Door & Garage Door Replacement (Security Doors)
Paint Color Change
Porch Reconstruction and other Repairs (Satellite Dishes)
Roof Replacement
Fence, Paving, Walls, Landscaping Installation/Removal
Demolition (including partial demolition)
Sign Installation/Replacement
Building Cleaning
Replacement of Historic Siding Material
Window Replacement
APPLICATIONS ON-LINE
New
Construction/Additions
Replacement of Historic Roofing Material
Replacement of Historic Siding Material
Window Replacement
What Requires Commission Review
- New Construction and Additions (including garages)
- Door and Garage Door Replacement (Security Doors)
- Paint Color Change
- Porch Reconstruction and other repairs
- Roof Replacements
- Fence, Paving, Walls, Landscaping Installation/ Removal / Replacement
- Demolitions (including partial demolitions)
- Sign Installation and Replacement
- Building Cleaning
- Installation of antennas & satellite dishes
- Window Replacement
Applications are due 3 Mondays before each Commission meeting.
The Commission meets the second Wednesday of each month. All Commission meetings are held in the
Committee of the Whole Room, 13th floor, Coleman A. Young Municipal Center. Meetings are open to
the public; a call to HDC office can confirm the date and time.
TOP
Documentation Required For Review By Historic Commission
Per Resolution 98:02, Adopted 3-11-98, Effective 6-1-98, Amended 11-14-01
NEW
CONSTRUCTION / ADDITIONS (including garages)
- A completed City of Detroit Application for Building Permit (Permit #1 for new construction,
Permit #2 for additions);
- A complete Historic District Commission Application for New Construction
or Additions; and
- One (1) set of scaled and/or dimensioned drawings on 11"x 17" paper and one (1) set of blueprints
OR ten (10 sets of non-returnable blueprints that include:
- site plan showing all changes and landscape features, including location of construction
fencing if applicable;
- floor plans;
- elevations;
- sections and other details as needed;
- material samples and colors for roofing, siding, and trim;
- brochures showing materials and design for windows, doors, garage doors, exterior lighting,
and fencing; and
- the time frame for the project including a start date, exterior completion date,
landscaping completion date, and occupancy date.
TOP
DOOR & GARAGE DOOR REPLACEMENT (Security Doors)
- A completed City of Detroit Application for Building Permit #2;
- A detailed description of existing doors including materials, and a statement of why
repair is not possible and replacement is necessary;
- Brochures showing materials and design of doors.
TOP
PAINT COLOR CHANGE
- A completed City of Detroit Application for Building Permit #2;
- Samples of the proposed paint color (i.e., paint chips) and a list of locations where
paint color will be applied (photographs and/or diagrams may also be used).
TOP
PORCH RECONSTRUCTION AND OTHER REPAIRS
(Satellite dishes)
- A completed City of Detroit Application for Building Permit #2;
- A detailed description of proposed work including:
- description of existing materials and colors;
- a description of which components will be retained or repaired;
- a statement of why the components being replaced cannot be repaired; and
- a description of the proposed replacement materials and colors.
TOP
ROOF REPLACEMENTS (Historic Roof Materials)
- A completed City of Detroit Application for Building Permit #2;
- Material samples (for asphalt shingles a 3"x3" piece is sufficient);
- A description of existing roofing material and color (provide a sample if possible);
- A detail description of proposed work, including related work such as gutters, soffit and fascia; and
- A complete Historic District Commission Application for Replacement of
Historic Roofing which includes:
- two (2) estimates of the cost to repair the existing roof;
- two (2) estimates of the cost to replace with the same material;
- two (2) estimates of the cost to replace with new imitation of the original material (synthetic slate or tile);
- two (2) estimates of the cost for asphalt shingle replacement; and
- A letter from the owner or occupant stating why the historic roofing material needs to be
replaced.
TOP
ROOF REPLACEMENTS (non-Historic Roof Materials)
- A completed City of Detroit Application for Building Permit #2;
- Material samples (for asphalt shingles a 3"x3" piece is sufficient);
- A description of existing roofing material and color (provide a sample if possible);
- A detail description of proposed work, including related work such as gutters, soffit and
fascia.
TOP
FENCE, PAVING,
WALLS, LANDSCAPING INSTALLATION/REMOVAL
- A completed City of Detroit Application for Building Permit #2;
- A scaled and/or dimensioned site plan showing:
- the existing lot lines;
- the existing buildings;
- the location and dimension of existing and proposed sidewalks, driveways, fencing
(including height), landscape materials, and other landscape features.
- Material and color samples from fencing, walls, paving
- Brochure(s) showing fencing other manufactured landscape items proposed; and
- In cases of removal include a detailed justification of why item(s) need to be removed.
TOP
DEMOLITION (including partial demolitions)
- A completed City of Detroit Application for Building Permit #3;
- Detailed justification stating why building or portion of building needs to be demolished;
- A detailed description of what will happen to the site after the demolition occurs; and
- In cases of partial demolition, include elevation showing the building and surface
treatments to newly exposed walls.
TOP
SIGN INSTALLATION/REPLACEMENT
- A completed City of Detroit Application for Building Permit #5;
- Scaled and dimensioned drawings of signs;
- In cases where signs will be attached to the building, include the entire building elevation;
- Color and material samples; and
- In cases of replacement, a detailed description including the colors, materials and
location(s) of existing signs and justification of why the signs need to be replaced.
TOP
BUILDING CLEANING
- A completed City of Detroit Application for Building Permit #2;
- A detailed description of the cleaning method, including the names of chemicals and the pressure of any washes or application(s);
- Brochures for cleaning agents; and
- A description of the surface treatment after cleaning.
TOP
REPLACEMENT OF HISTORIC SIDING MATERIAL
- A completed City of Detroit Application for Building Permit #2;
- A brochure or other information giving the color, materials, and dimensions
of the proposed replacement siding;
- A complete Historic District Commission Application for Replacement of
Historic Siding which includes:
- two (2) written estimates from different companies for the
repair and painting of the existing siding;
- two (2) written estimates for different companies for the
replacement and painting of the siding in matching materials;
- two (2) written estimates from different companies for the
replacement of the siding with an alternate (synthetic) material;
- A letter from the owner or occupant stating why the siding must be
replaced; and
- detailed photographs showing deterioration of the original siding (if
you cannot provide photos, Commission staff can take the photos by
appointment at your request).
TOP
WINDOW REPLACEMENT (Historic Windows)
- A completed City of Detroit Application for Building Permit #2;
- A brochure or other information giving the color, materials, and configuration of the proposed windows;
- A completed Historic District Commission Application for Replacement of
Historic Windows
which includes;
- two (2) estimates for repair of the existing windows;
- two (2) estimates for replacement with windows in matching materials and
configuration;
- two (2) estimates for replacement in an alternate material;
- A letter from the owner or occupant stating why the windows must be
replaced; and
- Interior photographs showing deterioration of windows (if you cannot
provide photos, Commission staff can take the photos by appointment at
your request);
THESE ARE THE MINIMUM REQUIREMENTS. THE COMMISSION AND ITS STAFF RESERVES THE RIGHT TO ASK
FOR ADDITIONAL INFORMATION AS AN INDIVIDUAL CASE REQUIRES.